Schedule, cost, risk, and resource management in one platform. Monte Carlo simulation, earned value, and contractor tracking — built for how real projects work.
Critical path method engine with forward/backward pass, float calculation, Gantt visualization, and P6 XER export.
Three-point estimates, cost actuals with source tracking, breakdown codes, committed vs forecast vs actual views.
5x5 risk matrix, pre/post mitigation scoring, risk-to-cost linking, EMV exposure tracking with Monte Carlo integration.
10,000-iteration cost and schedule simulation. 10 chart types including tornado, S-curve, scatter, and sensitivity analysis.
Full AACE-compliant EVM: PV, EV, AC, CPI, SPI, EAC, TCPI, VAC. Baseline snapshots with variance tracking.
Cross-project analysis workspace. Select projects and sections, run combined Monte Carlo, export to PPTX and Excel.
Daily/weekly Labour, Equipment, Materials tracking. Approval workflow with auto-rollup into cost actuals.
Weekly grid entry with project-activity allocation. Submit/approve workflow, overtime flagging, resource loading matrix.
Group projects into programs with aggregated KPIs. Portfolio RAG dashboard, gap detection, and executive reporting.
Name it, add sections, start. Upload breakdown codes or build as you go. Import from P6 XER if migrating.
Add activities, costs, and risks via web forms or Excel templates. Three-point estimates throughout.
Monte Carlo simulates 10,000 scenarios. EVM calculates indices. Gap detection flags what's missing.
Export to PowerPoint and Excel. Share the portfolio dashboard. Track timesheets and LEMs. Repeat weekly.
Stop stitching together spreadsheets. Get a single source of truth for schedule, cost, and risk — with the analysis tools to back it up.